Spooner  Industrial

Foundation Prep Services

We provide: foundation excavation & preparation; perimeter drains & down spout piping;

foundation backfill & compaction; radon rock, & slab prep (including rebar placement) and more!

Includes:

4” PVC Piping

¾” Round Drain Rock

6oz. Non-Woven Filter Cloth.

What's Involved

Use of the right size packer for the situation

Backfilling in appropriate lifts to being able to surpass any compaction test.

Includes:

4” PVC

¾” Clean Gravel

10mil poly

Rebar as Per Engineered Design

Our Guarantee

Scroll to Top